Rebulk

Rebulk Rail Maintenance · Early Access

Run railcar maintenance without the paperwork

Work orders, inspections, repairs, labor, parts, and documentation — one digital record per railcar, from the first inspection to the invoice. Built for repair facilities, transloaders, short lines, and shippers that maintain their own cars.

Work ordersDigital railcar historyBilling-ready records

One record from inspection to invoice

The work order is the spine of the shop. Everything that happens to a car — findings, repairs, hours, parts, photos — attaches to it, and to the car's permanent record.

Work Orders

Manage every job from initial inspection through completed repair

A car comes in, an inspection opens the job, and the work order carries it through repair, sign-off, and billing. No clipboard travels with the car; the record does.

Everyone in the shop sees the same job: what's been found, what's been done, and what's left before the car is released.

WO-2117 · WCKJ 10293

In progress
  1. Inspection

  2. Repair

  3. Verification

  4. Release

  5. Invoice

  • Finding · Worn brake shoe, B-end — repair opened from the inspection

  • Labor · 3.5 hrs logged on the job as it was worked

  • Parts · 2 × brake shoe, charged to this work order

  • Photos · 4 attached — before, during, after, sign-off

Illustrative work order. Everything the job touches lands on the same record.

WCKJ 10293 · Car history

4 visits

  1. Aug 2026

    Inbound inspection · 1 finding

    Opened WO-2117

  2. Mar 2026

    Gate seal repair

    WO-1893 · billed

  3. Nov 2025

    Wheel set replaced, R3 position

    WO-1541 · billed

  4. Jun 2025

    Inbound inspection · no findings

    Released same day

Illustrative history. When the car comes back, the record is already open.

Railcar Records

A complete digital history for every railcar

Every inspection, repair, part, and document accumulates on the car itself. When a car returns, its history is already open — not in a filing cabinet or someone's inbox.

One car, one record, for as long as you maintain it.

Inspections

Digitize the inspection, not just the paperwork

Inspectors work a defined set of points on each car. Findings, measurements, and photos attach to the point they came from, so the record shows what was checked — not just that someone signed the form.

Inbound inspection · covered hopper

7 points

WCKJ 102931234567
  1. B-end truck
  2. Wheels & bearings
  3. Brake rigging
  4. Hatch & seals
  5. Outlet gates
  6. Wheels & bearings
  7. A-end truck

Scale side profile of a 4750 cu ft covered hopper. Reporting mark shown is an example.

Every finding either closes the inspection or opens a repair on the work order. Nothing gets written twice, and nothing is left to a note in someone's pocket.

Everything the job touches, on the job

Inspections, repairs, labor, parts, documentation, and billing — recorded against the car and the work order as the work happens.

Inspections

Digitize inspections and the documentation that goes with them. Findings are recorded against the car and carried straight into the work order.

Repairs

Every repair is connected to the railcar and the work order it belongs to — what was done, by whom, and when, without chasing paper.

Labor

Hours land on the work order as technicians log them — not on a timesheet someone reconciles later.

Parts

Every part and material charged to a job is recorded against the car and the work order it was used on.

Documentation

Attach photos, inspection reports, repair records, and supporting documents to the job. The evidence lives with the work, not in a filing cabinet.

Billing

Completed jobs become billing-ready records — labor, parts, and documentation already attached, ready to invoice.

Every car in the shop, at a glance

Each car sits at a stage of its work order. The board shows where, without anyone walking the track to find out.

  • Which cars are waiting on an inspection
  • Which are open for repair, and what was found
  • Which are through verification and ready to release
  • How much capacity the shop has left this week

The shop board replaces the morning walk-through: when a customer calls about a car, the answer is on the screen, not out in the yard.

Shop board

4 cars in shop · 0 ready for service

  • WCKJ 10293

    Covered hopper

    Gate seals, B-end truck

    Inspection

    1/5

  • WCKJ 44817

    Tank car

    Valve rebuild, manway gasket

    Inspection

    1/5

  • WCKJ 20641

    Open-top hopper

    Wheel set, brake rigging

    Inspection

    1/5

  • WCKJ 78350

    Covered hopper

    Hatch replacement

    Inspection

    1/5

1. Inspection2. Repair Required3. Work In Progress4. Verification5. Ready for Service

Illustration of the shop workflow. Reporting marks shown are examples.

The numbers a shop actually runs on

Every job, hour, and part is recorded as the work happens, so the metrics come from the work itself — not from a spreadsheet someone rebuilds each month.

01

Repair cycle time

How long cars spend in the shop, from arrival to release.

02

Cars completed

Work finished per day, week, and month.

03

Labor hours

Technician hours logged, by job and by car.

04

Shop throughput

Cars moving through each stage of the shop.

05

Parts usage

Materials consumed across repairs, by part and by job.

Part of the Rebulk Platform

The car your shop repairs is the car the platform tracks

Rail Maintenance shares railcar records with the rest of the Rebulk Platform — the same car, from network tracking to yard moves to the shop to the invoice.

Frequently asked questions

What is Rebulk Rail Maintenance?

Rebulk Rail Maintenance is railcar maintenance and repair software. It manages work orders from initial inspection through completed repair, tracks labor and parts against each job, holds photos and inspection documentation, and builds a complete digital history for every railcar.

Who is Rebulk Rail Maintenance for?

Railcar repair facilities, transloaders that run maintenance operations, short lines, industrial rail facilities, and shippers maintaining their own railcars. If your shop runs on paper inspection forms and spreadsheet job logs, this replaces them.

Does it replace paper inspection forms?

Yes. Inspections are digitized, and the documentation that goes with them — photos, inspection reports, supporting documents — is attached directly to the railcar and the work order instead of living in a binder.

How does billing work?

When a work order is completed, it becomes a billing-ready record: the labor hours, parts, and documentation are already attached to the job, so invoicing starts from the work that was actually performed.

Does it connect to the rest of the Rebulk Platform?

Yes. Rail Maintenance shares railcar records with Rebulk Yard Switching, Rebulk Track & Trace, and Rebulk Transload, so the car your shop repairs is the same car the rest of the operation tracks, moves, and bills.

When is Rebulk Rail Maintenance available?

Rebulk Rail Maintenance is in early access. We're working with a small group of maintenance operations to set the product up on their shop workflow. Join early access or book a demo to see it on your operation.

See Rebulk Rail Maintenance in your operation.

We're working with a small group of early-access partners to set the product up on their own shop workflow — their inspection forms, their repair codes, their billing. Bring yours.